169 MW Iepuresti Photovoltaic Power Plant + 400 kV Iepuresti Electrical Substation

Location: Iepuresti, Giurgiu County | Year: 2025

Project Overview: Iepuresti photovoltaic park, located in Giurgiu County, has an installed capacity of 169 MW.. It is estimated that the project it is part of (along with the Ghimpati photovoltaic park), will generate approximately 386 GWh of renewable electricity annually, avoiding around 160.000 tons of CO₂ emissions per year.

Our Scope:

  • Preparation of technical documentation and support during approval meetings with CNTEE Transelectrica SA for establishing operational data transmission links for integration into the EMS - SCADA monitoring and control system of CNTEE Transelectrica SA – DET Bucharest/DEC
  • Turn-key solution: supply, installation, and commissioning (PIF) of data transmission systems required for integration into the operational transmission system EMS - SCADA of CNTEE Transelectrica SA – DET Bucharest/DEC
  • SCADA engineering and modeling services required for integration into the EMS - SCADA system of CNTEE Transelectrica SA – DET Bucharest/DEC, including signing the Integration Protocol with CNTEE Transelectrica SA

Status: In progress