121.298 MW Calugareni 2 Photovoltaic Power Plant + 220 kV Calugareni Electrical Substation

Location: Calugareni, Giurgiu County | Year: 2025

Project Overview: Grid connection of Calugareni 2 photovoltaic power plant, with an installed capacity of 121.298 MW located in Calugareni, Giurgiu County, to the public electricity network – Connection Installation Operator.

Our Scope:

  • Procurement of installations, equipment, materials, and technological systems
  • Engineering and design services, training of the beneficiary's personnel regarding Telecommunications systems, FAT and SAT testing with the participation of Transelectrica personnel
  • Construction and installation works:
    • Configuration and parameterization of Telecommunications equipment and installations
    • Integration of Telecommunications equipment/installations into the existing/new systems of the Contracting Authority and CNTEE Transelectrica
    • Grounding check of the installed equipment
    • Equipment/system testing and commissioning (commissioning, availability test)

Status: In progress