Green Breeze Wind Farm – 220kV Frumusița Substation
Location: Galați County | Year: 2025
Project Overview: Green Breeze wind farm is located in Galați County, mainly within the administrative boundaries of Cuca commune, and has an installed capacity of 98.64 MW. It will include 16 Vestas V162-6.2 MW wind turbines and will significantly contribute to reducing CO₂ emissions and increasing Romania’s energy independence.
Our Scope:
- Procurement of installations, equipment, materials, and technological systems
- Preparation of Technical Execution Project and As-Built documentation
- Configuration and parameterization of Telecommunications equipment/systems
- Engineering, design, training, installation services, and integration into the TSO system
- Execution of FAT and SAT tests with the participation of Transelectrica personnel
Status: In progress