121.298 MW Calugareni 2 Photovoltaic Power Plant + 220 kV Calugareni Electrical Substation
Location: Calugareni, Giurgiu County | Year: 2025
Project Overview: Grid connection of Calugareni 2 photovoltaic power plant, with an installed capacity of 121.298 MW located in Calugareni, Giurgiu County, to the public electricity network – Connection Installation Operator.
Our Scope:
- Procurement of installations, equipment, materials, and technological systems
- Engineering and design services, training of the beneficiary's personnel regarding Telecommunications systems, FAT and SAT testing with the participation of Transelectrica personnel
- Construction and installation works:
- Configuration and parameterization of Telecommunications equipment and installations
- Integration of Telecommunications equipment/installations into the existing/new systems of the Contracting Authority and CNTEE Transelectrica
- Grounding check of the installed equipment
- Equipment/system testing and commissioning (commissioning, availability test)
Status: In progress